Launch System

Purpose:
LS is intended for ILV with various Payloads holding up when prelaunch preparation and launch.
Year of release: 2008
Guaranteed service life (years):
Specified Service Life- 10 years
Estimated production / delivery time (months): 36/5
Flight qualification of the product: No
Brief history of flight qualification: No
Possibility to adapt the product to customer requirements: Yes


Parameter Value

Description

LS is a metal structure on which the equipment as follows is assembled: 4 Frames for ILV weight load taking; 4 Frames for ILV holdup when wind forcing; 2 Masts for supply lines connexion to ILV. Inside the frame basements the sets of electric and hydraulic equ
... LS is a metal structure on which the equipment as follows is assembled: 4 Frames for ILV weight load taking; 4 Frames for ILV holdup when wind forcing; 2 Masts for supply lines connexion to ILV. Inside the frame basements the sets of electric and hydraulic equipment for the Frames motion provision are placed. Also different lines connecting to ILV are laid along the Frames.
Read more...

Legal information
Please note that this site is for informational purposes only and under no circumstances is not a public offer determined by the provisions of the Part 2 Article 437 of the Civil code of the Russian Federation. Information on this site may be changed or supplemented.